-
Ampad Double Sheet Writing Pads - 100 Sheets - 15 lb Basis Weight - 8 1/2" x 11 3/4" Sheet Size - 11.75" Height x 8.5" Width x 0.4" Depth - White Paper - Micro Perforated, Easy Tear, Rigid, Chipboard Backing - 1 Pad
Regular price $16.48 USDRegular price$17.49 USDSale price $16.48 USDSale -
Ampad Engineering Computation Pad - 200 Sheets - Both Side Ruling Surface - Ruled Margin - 15 lb Basis Weight - Letter - 8 1/2" x 11" Sheet Size - Green Tint Paper - Chipboard Backing - 1 Pad
Regular price $37.48 USDRegular priceSale price $37.48 USD -
Ampad Evidence Narrow Ruled Dual Pad - 100 Sheets - 15 lb Basis Weight - 8 1/2" x 11 3/4" Sheet Size - 11.75" Height x 8.5" Width x 0.4" Depth - Canary Paper - Micro Perforated, Easy Tear, Rigid, Chipboard Backing - 1 Each
Regular price $16.48 USDRegular price$17.49 USDSale price $16.48 USDSale -
Ampad Gold Fibre Classic Project Planner - Action - White Sheet - Wire Bound - White - Classic Green Cover - 9.5" Height x 7.2" Width - 1 Each
Regular price $12.42 USDRegular price$16.67 USDSale price $12.42 USDSale -
Ampad Gold Fibre Classic Wirebound Legal Pads - 70 Sheets - Wire Bound - 0.34" Ruled - 20 lb Basis Weight - 8 1/2" x 11 3/4" Sheet Size - 0.43" Height x 8.5" Width x 12.3" Length - White Paper - Brown Cover - Micro Perforated, Rigid, Chipboard Backing...
Regular price $13.00 USDRegular price$16.77 USDSale price $13.00 USDSale -
Ampad Gold Fibre Graph Pad - 50 Sheets - Both Side Ruling Surface - 16 lb Basis Weight - Letter - 8 1/2" x 11" Sheet Size x 8.5" Width x 11.8" Length - Canary Paper - Heavyweight, Chipboard Backing, Mediumweight, Pinhole Perforated, Watermarked, Smooth...
Regular price $14.46 USDRegular priceSale price $14.46 USD -
Ampad Gold Fibre Medium Ruled Perforated Remanufactured Jr. Legal Pads - 50 Sheets - Watermark - Stapled/Glued - 5" x 8" Sheet Size - White Paper - Micro Perforated, Bleed-free, Chipboard Backing - 4 / Pack
Regular price $16.31 USDRegular priceSale price $16.31 USD -
Ampad Gold Fibre Narrow Rule Writing Pads - 50 Sheets - Watermark - Stapled/Glued - 0.25" Ruled - 16 lb Basis Weight - Letter - 8 1/2" x 11 3/4" Sheet Size - Canary Yellow Paper - Micro Perforated, Bleed-free, Chipboard Backing - 12 / Dozen
Regular price $131.62 USDRegular price$138.69 USDSale price $131.62 USDSale -
Ampad Gold Fibre Personal Notebook - 100 Sheets - Wire Bound - 0.28" Ruled - 20 lb Basis Weight - 5" x 7" Sheet Size - White Paper - Classic Green Kraft Cover - Micro Perforated, Rigid, Chipboard Backing, Pocket, Easy Tear, Unpunched - 1 Each
Regular price $11.83 USDRegular price$22.26 USDSale price $11.83 USDSale -
Ampad Gold Fibre Premium Rule Writing Pads - Letter - 50 Sheets - Watermark - Stapled/Glued - 0.34" Ruled - 16 lb Basis Weight - Letter - 8 1/2" x 11 3/4" Sheet Size - Yellow Paper - Bleed-free, Micro Perforated, Chipboard Backing - 12 / Dozen
Regular price $94.64 USDRegular price$116.10 USDSale price $94.64 USDSale -
Ampad Graph Pad - 40 Sheets - Glue - 20 lb Basis Weight - Legal - 8 1/2" x 14" Sheet Size - White Paper - Chipboard Backing - 1 Pad
Regular price $20.26 USDRegular priceSale price $20.26 USD -
Ampad Graph Pad - 50 Sheets - Both Side Ruling Surface - 15 lb Basis Weight - Letter - 8 1/2" x 11" Sheet Size - White Paper - Pressboard Cover - Chipboard Backing, Smudge Resistant, Rigid - 1 Pad
Regular price $6.21 USDRegular price$9.47 USDSale price $6.21 USDSale -
Ampad Graph Pad - 50 Sheets - Both Side Ruling Surface - 15 lb Basis Weight - Tabloid - 11" x 17" Sheet Size - White Paper - Chipboard Backing, Smudge Resistant - 1 Pad
Regular price $30.36 USDRegular priceSale price $30.36 USD -
Ampad Graph Pad - 50 Sheets - Front Ruling Surface - 20 lb Basis Weight - Letter - 8 1/2" x 11" Sheet Size - White Paper - 1 Pad
Regular price $11.88 USDRegular price$13.08 USDSale price $11.88 USDSale -
Ampad Gregg-ruled White Steno Book - 80 Sheets - Wire Bound - Ruled Margin - 15 lb Basis Weight - 6" x 9" Sheet Size - White Paper - Chipboard Cover - Chipboard Backing, WireLock, Snag Resistant - 1 Each
Regular price $6.52 USDRegular price$9.48 USDSale price $6.52 USDSale -
Ampad Kraft Cover Steno Book - 60 Sheets - Wire Bound - Front Ruling Surface - 0.34" Ruled - Gregg Ruled Margin - 15 lb Basis Weight - 6" x 9" Sheet Size - Green Tint Paper - Kraft Cover - Chipboard Backing, Rigid, WireLock, Snag Resistant, Sturdy Cove...
Regular price $4.64 USDRegular price$6.86 USDSale price $4.64 USDSale
